Projects

THE HOSPITAL OF PROVIDENCE (MEMORIAL CAMPUS) ADA UPGRADES

  • Category: Medical
  • Completion Date: January 2011
  • Owner: Tenet Health Systems Limited dba Providence Memorial Hospital
  • Location: 
  • Contractor: Powers General Contractor

THE HOSPITAL OF PROVIDENCE (SIERRA CAMPUS) ADA UPGRADES

  • Category: Medical
  • Completion Date: February 2012
  • Owner: Tenet Health Systems Limited dba Sierra Medical Center
  • Location: Sierra Medical Center- El Paso, TX
  • Contractor: M.J. Harris, Inc.

THE HOSPITAL OF PROVIDENCE (MEMORIAL CAMPUS) 4 WEST

  • Category: Medical
  • Completion Date:
  • Owner: Tenet Health Systems Limited dba Providence Memorial Hospital
  • Location: 4 West Providence Memorial Hospital- El Paso, TX
  • Contractor/Architect:

THE HOSPITAL OF PROVIDENCE (MEMORIAL CAMPUS) 4TH FL. SCHUSTER TOWER RENOVATION

Remodel of 4,754 GSF of space reconfiguration and 16,630 GSF of new finishes to patient areas.

Project included major electrical and plumbing modifications. Millwork and toilet accessories were replaced.

  • Category: Medical
  • Completion Date: August 2014
  • Owner: Tenet Health Systems Limited dba Providence Memorial Hospital
  • Location: 4th Fl. Schuster Tower- El Paso, TX 
  • Architect: PhiloWilke Partnership

THE HOSPITAL OF PROVIDENCE (SIERRA CAMPUS) MRI EQUIPMENT REPLACEMENT

Work consisted in upgrading MRI equipment from 1.5T to 3.0T. Remove existing shielding and upgrade. 

  • Category: Medical
  • Completion Date: January 2015
  • Owner: Tenet Health Systems Limited dba Sierra Medical Center
  • Location: MRI Sierra Medical Center- El Paso, TX
  • Architect: Fokus Architecture, Inc.

SIERRA MEDICAL CENTER 4TH FL. REHABILITATION SUITES

  • Category: Medical
  • Completion Date: December 2015
  • Owner: Tenet Health Systems Limited dba Sierra Medical Center
  • Location: 4th. Fl. Rehabilitation Suites Sierra Medical Center- El Paso, TX
  • Architect: PhiloWilke Partnership